Fee Schedules

FLAT RATE PROJECT PERMITS
(Projects that are not associated with New Construction/Addition/Remodel)
Deck Permit - $100.00
Fence Permit - $50.00
Residential Yard Shed - $50.00
Permanent Swimming Pool Permit - $100.00 all inclusive
Roof Replacement Permit (One & Two Family) - $50.00
All Other Roof Replacement Permit - $100.00
Siding/Soffit/Fascia Permit - $50.00
Windows/Doors Permit - $50.00
Water Heater Permit - $50.00 per unit
Water Treatment Device Permit - $50.00 per unit
Residential Furnace Permit - $50.00
Residential A/C Permit - $50.00 plus $50.00 electric if new installation
Commercial HVAC Equipment - $50.00 per unit
Residential Electrical Service Permit - $50
Moving or Demolition Permit - $50 per building
Sign Permit - $50.00 plus $1.00 per square of sign area
Minimum Permit Fee - $50 Special Inspections - $25/ half-hour

New Construction/Addition/Alteration Building Groups
Group 1 - All residential buildings, single family, two-family and multifamily dwellings, residential garages, storage sheds and decks.  (This group does not include hotels, motels or institutional buildings).
Note:  Certain projects within group 1 have set permit fees.  Please see Miscellaneous Permit Fees.

Group 2- General and professional offices, barber shops, beauty parlors, bowling alleys, dry-cleaning establishments, clinics, natatoriums, shelters, hotels and motels, taverns, restaurants, cafeterias, retail establishments, commercial garages, service stations, churches, assembly halls, theaters, exhibition buildings, educational institutions, hospitals, nursing homes, places of detention, gymnasiums, arenas, laboratories, lodge halls, funeral homes, libraries, skating rinks, dance halls, and armories.

Group 3 - Warehouses, freight terminals, storage buildings, refrigeration storage, factories, machine shops, electric sub-stations, sewage treatment plants, heating plants, steam & electric generating plants, transformer vaults and other building not classified in Groups I or 2.

All areas*- Areas included for fee calculation purposes shall include all floor levels, basement, attached garages, decks, porches, and all spaces enclosed and under roof.  All area shall be the area associated with the particular project.

NEW CONSTRUCTION AND ADDITION PERMITS
Building Fees
Building permit fees shall be the sum of:
Base Fee - $50 plus:
Fee Determined by Building Group and Size
Group 1 $.08 per square foot of all areas*
Group 2 $.09 per square foot of all areas*
Group 3 $.05 per square foot of all areas*
             
Electrical Fees
Electrical permit fees shall be the sum of:
Base Fee - $50, plus:
Fee Determined by Building Group and Size
Group 1 $.05 per square foot of all areas*
Group 2 $.06 per square foot of all areas*
Group 3 $.05 per square foot of all areas*

Plumbing Fees
Plumbing permit fees shall be the sum of:
Base Fee - $50, plus:
Fee Determined by Building Group and Size
Group 1 $.05 per square foot of all areas*
Group 2 $.06 per square foot of all areas*
Group 3 $.05 per square foot of all areas*

Heating/Ventilating/Air Conditioning Fees
Heating/Ventilating/Air Conditioning permit fees shall be the sum of:
Base Fee - $50, plus:
Fee Determined by Building Group and Size
Group 1 $.05 per square foot of all areas*
Group 2 $.06 per square foot of all areas*
Group 3 $.05 per square foot of all areas*

ALTERATION AND REPAIR PERMITS
Building Fees
Building permit fees shall be the greater of:
Base Fee - $50 or:
Fee Determined by Building Group and Size
Group 1 $.08 per square foot of all areas*
Group 2 $.09 per square foot of all areas*
Group 3 $.05 per square foot of all areas*
             
Electrical Fees
Electrical permit fees shall be the greater of:
Base Fee - $50, or:
Fee Determined by Building Group and Size
Group 1 $.05 per square foot of all areas*
Group 2 $.06 per square foot of all areas*
Group 3 $.05 per square foot of all areas*

Plumbing Fees
Plumbing permit fees shall be the greater of:
Base Fee - $50, or:
Fee Determined by Building Group and Size
Group 1 $.05 per square foot of all areas*
Group 2 $.06 per square foot of all areas*
Group 3 $.05 per square foot of all areas*

Heating/Ventilating/Air Conditioning Fees
Heating/Ventilating/Air Conditioning permit fees shall be the greater of:
Base Fee - $50, or:
Fee Determined by Building Group and Size
Group 1 $.05 per square foot of all areas*
Group 2 $.06 per square foot of all areas*
Group 3 $.05 per square foot of all areas*

MISCELANEOUS FEES

Exterior Sanitary, Water, and Stormwater Systems –
$50.00 per 100 lineal foot of pipe.
Erosion Control Fees (any land disturbance)
Accessory Structures and Additions up to one acre - $0.015 per square foot of building footprint
-Group 1 New Construction up to one acre - $170 plus $0.015 per square foot of building footprint
-Group 1 one acre or more, Group 2 and Group 3 - charged through Engineering Department
Early Start Permit - $75.00
Driveway Opening - $25.00
Wisconsin State Seal - $33.00
Certificate of Occupancy - $50.00 per unit
Delinquent Permit Penalty - A penalty equal to the amount of the permit fee at the time of application shall be assessed whenever the required permit is not obtained prior to commencing work.
Misc. or extraordinary administrative or field inspection services - $25.00 per half hour